Difference between revisions of "Mr Baskett"

From ESAT
Jump to navigation Jump to search
Line 5: Line 5:
 
==Contribution to SA theatre, film, media and/or performance==
 
==Contribution to SA theatre, film, media and/or performance==
  
He was responsible for revamping the [[Sefton Parry]]'s original [[Theatre Royal]] in Harrington Street, Cape Town for [[H.J. le Roy]], who had hired the theatre.  
+
He was responsible for revamping the [[Sefton Parry]]'s original [[Theatre Royal]] in Harrington Street, Cape Town for [[J.H. le Roy]], who had hired the theatre.  
  
 
The company [[Tuppen and Stonestreet]] were the architects and the decorator was the set designer [[R.S. Cooper]]. The [[Le Roy and Duret]] company utilised the revamped venue from 29 January 1866 till 13 July 1868, when the building burnt down.
 
The company [[Tuppen and Stonestreet]] were the architects and the decorator was the set designer [[R.S. Cooper]]. The [[Le Roy and Duret]] company utilised the revamped venue from 29 January 1866 till 13 July 1868, when the building burnt down.

Revision as of 06:53, 2 September 2021

Mr Baskett (fl 1860s) was a Cape Town building contractor

Biography

Contribution to SA theatre, film, media and/or performance

He was responsible for revamping the Sefton Parry's original Theatre Royal in Harrington Street, Cape Town for J.H. le Roy, who had hired the theatre.

The company Tuppen and Stonestreet were the architects and the decorator was the set designer R.S. Cooper. The Le Roy and Duret company utilised the revamped venue from 29 January 1866 till 13 July 1868, when the building burnt down.

Sources

F.C.L. Bosman. 1980. Drama en Toneel in Suid-Afrika, Deel II, 1856-1916. Pretoria: J.L. van Schaik: pp.

Go to the ESAT Bibliography

Return to

Return to ESAT Personalities B

Return to South African Theatre Personalities

Return to The ESAT Entries

Return to Main Page